Antequera gauge changer seen from the train. The train loco has uncoupled and shunted to the right of the picture and the coaches then roll down the gradient into the shed. Once the first coach is through the aparatus, an Iberian (broad) gauge diesel will attatch and haul the train through. Click photo to continue